Drywall Installation in Franklin, WI
Hanging new drywall the right way, so the finishing is easier and the walls stay flat for years.

Good finishing starts with a good hang. When sheets are laid out to minimize seams, butt joints are kept away from the middle of walls, and fasteners are set at the right depth and spacing, the taping goes faster and the finished wall looks better. When the hang is rushed, no amount of mud fully hides it.
Franklin Elite Drywall installs drywall for new homes, additions, remodels, and commercial interiors. We handle the hang on its own or as part of a full hang-tape-finish job.
Typical installation projects
New construction
Whole-house or whole-suite drywall following framing, rough-ins, and insulation.
Additions
New rooms that need to tie cleanly into existing walls and ceilings.
Remodels
Kitchens, baths, and reconfigured rooms where walls have been opened or moved.
Basements and garages
Lower-level living space and garage walls and ceilings.
Commercial partitions
Offices, suites, and interior walls in commercial spaces.
Details that make a better hang
Sheet size matters. Longer sheets — 10 or 12 feet — mean fewer butt joints, which are harder to finish than the tapered factory edges. On walls, sheets are usually hung horizontally, which reduces the total length of seams and puts them at a comfortable height for finishing. Ceilings go up first so the wall sheets help support their edges.
Fastening affects everything that follows. Screws should be set just below the surface without tearing the paper, spaced according to the board manufacturer’s guidelines, and kept back from the edges. Over-driven screws lose their grip; under-driven ones poke through the finish. Adhesive on studs and joists can reduce the number of fasteners and help prevent pops.
Joints are arranged to avoid lining up with the corners of doors and windows, where movement concentrates and cracks tend to form. Proper backing is added for cabinets, grab bars, TV mounts, and heavy fixtures before the board goes up — it is far easier than adding it later.

Representative photo.
How an installation typically proceeds
A general outline — the exact steps depend on the condition of the space and the scope you choose.
Pre-hang check
Confirm framing is straight, rough-ins and insulation are complete, and inspections are done.
Plan sheet layout
Choose sheet sizes and orientation to minimize butt joints and keep seams away from openings.
Hang ceilings
Install ceiling board first, using lifts or extra hands, with appropriate fastening.
Hang walls
Install wall board horizontally, cut cleanly around boxes and openings, and fasten to spec.
Ready for finishing
Check fasteners, pre-fill gaps, install corner bead, and hand off to taping.
Board types and installation materials
The right product depends on where it is going. These are the materials that most often come up for this kind of work.
1/2-inch standard drywall
The common choice for interior walls.
5/8-inch Type X
Fire-rated board for garages, ceilings, and rated assemblies.
Sag-resistant ceiling board
Designed to stay flat between joists, especially under insulation.
Moisture- and mold-resistant board
For bathrooms, laundry rooms, and basements.
Sound-dampening board
For bedrooms, offices, and media rooms where noise control matters.
Drywall screws and adhesive
Secure fastening that reduces pops over time.
Why the hang deserves attention
- Fewer and better-placed seams for a smoother finished wall.
- Fewer nail pops and cracks over the years.
- Correct board for each area — fire, moisture, sound, or standard.
- A clean handoff to finishing that saves time on the rest of the job.



What drywall installation changes.
Drag the divider (or focus it and use your arrow keys) to compare a typical starting condition with a finished result.
BeforeAfter
Illustrative stock photography showing typical before and after conditions — not a Franklin Elite Drywall project. Real project photos will be added here.
Installation around Franklin
Drywall installation in Franklin often happens alongside a permit and inspection process, especially for basements, additions, and garages. Inspectors typically want to see framing, insulation, and rough-ins before the board goes up, so the drywall schedule has to fit around those visits. Planning for that keeps the project moving.
Drywall Installation FAQs
Have a question that is not covered here? Include it with your estimate request.
Should drywall be hung vertically or horizontally?
On most residential walls, horizontally. It usually means fewer and shorter seams and puts the long seam at a comfortable working height. Some commercial walls and tall walls are hung vertically for specific reasons.
What thickness of drywall do I need?
1/2-inch is standard for most interior walls. 5/8-inch is common for ceilings, garages, and fire-rated walls. Your building plans or inspector may specify particular types.
Do you install insulation too?
Insulation is often handled by a separate contractor. It needs to be in place — and inspected if required — before the drywall goes up.
How long does it take to hang a room?
Hanging is usually the quickest phase. A single room can often be hung in a day; whole floors and houses take longer. Finishing takes more time than hanging because each coat needs to dry.
Often part of the same project.
Have a project ready for drywall?
Tell us what has been framed, the approximate square footage, and your timing. We will follow up to talk through the job.


